The City of Menlo Park Public Works Department is soliciting informal bids for the work to be done consists, in general, of installing a concrete platform over an existing parking space(s), a metal grate over existing curb gutter sections of metal cable guard rails, an access ramp, pickup and delivery and installation of City Furnished cement planter boxes, and other incidentals as necessary to complete the work at specified location; all as in the specification and shown on the plans with the titles “Santa Cruz Street Café Project: BISTRO VIDA & HARVEST LOCATION” and “Santa Cruz Street Café Project: LEFT BANK LOCATION”. The scope of work is detailed in the Request to Bidders, Attachment A, project plans and is only summarized here:
Traffic Control
- Site clearing and preparation
- Construction of wooden concrete perimeter forms
- Installation of the vapor barrier slip sheet to isolate new concrete from the existing asphalt and existing concrete gutter pan
- Install reinforced concrete platform with stamped finish
- Install ADA compliant Grate over existing gutter, custom cut and install ADA compliant Grate over existing gutter in curved areas
- Transport, Position, fill with drain rock/ soil, and paint concrete planter boxes according to project plans
- Install lighting supports
The City will
- Furnish concrete planter boxes
- Furnish ADA compliant Grate
|
|
|
8/12/2016 4:00 pm
|
|
8/26/2016 4:00 pm
|
|
Optional August 22, 2016 @ 2pm
|
|
Michael Tsai, Assistant Engineer
|
|
7:30-5:30 M-TH, 8-5 Alt Fri
|
|
An optional pre-bid conference meeting will be held on August 22, 2016 @ 2 pm, Monday, in Fish Bowl conference room- 701 Laurel St, Menlo Park, CA for interested bidders.
|
|
|
|