COMMUNITY DEVELOPMENT DEPARTMENT
February 1, 2013 Plans (West Campus) Cover, Index, Area Plan Architectural Site Plans [5.9 MB] Floor Plans [8.4 MB] Elevations Emergency Vehicle Access Plans [1.4 MB] Trash and Recycling, Delivery, and Security Plans [1.8 MB] Sections [1.3 MB] Shadow Study Photo Simulations [2.0 MB] Civil [13.0 MB] Landscape [22.9 MB] December 3, 2012 Plans (West Campus) Cover, Index, Area Plan [1.5 MB] Architectural Site Plans [5.6 MB] Floor Plans [6.6 MB] Elevations Emergency Vehicle Access Plans [2.0 MB] Trash and Recycling, Delivery, and Security Plans [3.1 MB] Sections [3.0 MB] Shadow Study [1.2 MB] Photo Simulations [5.5 MB] Civil [1.6 MB] Landscape [11.9 MB] August 27, 2012 Plans (West Campus) Cover, Index, Area Plan Architectural Site Plans [4.9 MB] Floor Plans [8.3 MB] Emergency Vehicle Access Plans [1.5 MB] Trash and Recycling, Delivery, and Security Plans [7.1 MB] Sections [2.3 MB] Shadow Study Photo Simulations [3.3 MB] Civil [2.3 MB] Landscape [14.6 MB] Applicant Presentation - September 24, 2012 Planning Commission Meeting [76 MB] - features images of building model April 20, 2011 Plans Cover, Index, Area Plan Architecture [1.8 MB] Landscape [2.0 MB] All above plans at half-size [18.3 MB] October 20, 2011 Plans Cover, Index, Area Plan [1.7 MB] East Campus Architecture [6.9 MB] Landscape [1.9 MB] West Campus Architecture [31.8 MB] Landscape [23.9 MB] Civil [67.8 MB] August 5, 2011 Plans Cover Sheet Drawings Index A.0 - Area Plan [1.6 MB] East Campus Architecture EA.1 - Existing Site Plan EA.2 - Proposed Parking Plan [28.8 MB] EA.3 - Trash & Recycling Collection Plan EA.4 - Generator Location Plan Landscape EL.1 - Preliminary Landscape Plan [1.8 MB] West Campus Architecture WA.1 - Existing Site Plan WA.2 - Proposed Site Plan WA.3.1 - P1 Plan: Bicycle Commuter & EV/LEV Plan [1.0 MB] WA.3.2 - First Floor Level Plan [1.6 MB] WA.3.3 - Upper Floor Level Plans - 2nd, 3rd & 4th [1.3 MB] WA.3.4 - Roof Level Plan WA.3.5 - Parking Structure Floor Plans [1.3 MB] WA.3.6 - Proposed Area Statement WA.3.7 - Supplemental Bridge Photos & Minimum Lighting Standard WA.4.1 - Emergency Vehicle Access Plan [1.6 MB] WA.4.1.1 - Emergency Vehicle Turning Plan WA.4.1.2 - Emergency Vehicle Turning Plan WA.4.1.3 - Emergency Vehicle Turning Plan WA.4.1.4 - Emergency Vehicle Turning Plan WA.4.2 - Trash & Recycling Collection Plan WA.5.1 - Site Sections Set 1 WA.5.2 - Site Sections Set 2 WA.5.3 - Site Sections Set 3 [1.1 MB] WA.5.4 - Site Sections Set 4 [1.2 MB] Landscape WL.1 - Tree Disposition Plan [5.4 MB] WL.2 - Preliminary Landscape Plan [6.2 MB] WL.3 - Pedestrian & Bike Connectivity [1.4 MB] WL.3.1 - Ped. & Bike Connectivity - East Campus [1.8 MB] WL.3.2 - Ped. & Bike Connectivity - West Campus WL.3.3 - Tunnel Connectivity [3.4 MB] WL.3.4 - Tunnel Cross Section Civil WI.1 - Proposed Grading Plan [1.4 MB] WI.2 - Proposed Storm Drainage System WI.3 - Proposed Storm Water Quality Plan [1.1 MB] WI.4 - Proposed Sanitary Sewer System WI.5 - Proposed Water System WI.6 - Proposed Joint Trench All Plans Full-size (22" x 34") [74.5 MB] Half-size (11" x 17") [67.8 MB] Files under 1 MB in size, unless otherwise noted. Subscribe to Facebook Campus Project updates
February 1, 2013 Plans (West Campus)
December 3, 2012 Plans (West Campus)
August 27, 2012 Plans (West Campus)
April 20, 2011 Plans
October 20, 2011 Plans
August 5, 2011 Plans
Subscribe to Facebook Campus Project updates