Caltrain Bike/Pedestrian Undercrossing Study and Conceptual Design
There is currently no way to cross the Caltrain tracks between Ravenswood Avenue and San Francisquito Creek.
This project will examine several sites within these limits for determining the best location for a bike/pedestrian undercrossing
and a connecting access easement from/to El Camino Real. A conceptual design will also be developed.
This project is included in the City's General Plan and has been approved as a City Council Project Priority for FY 2007-08.
|
|
|
|
2008, Nov
|
A community meeting will be held to consider a preferred conceptual plan.
|
|
2008, Dec
|
The preferred location and conceptual design will be presented to the City Council.
|
|
|
2008, Sep 10
|
The preferred location, as indicated by the general consensus of those in attendence of the previous public meetings, was presented to the
Transportation Commission. The Commission voted to accept the location
as presented by staff, namely the Middle Ave to Burgess Park alignment, for the bike/pedestrian tunnel. The motion passed with three votes yes,
two votes no, and two abstentions.
|
|
2008, Sep 8
|
The preferred location, as indicated by the general consensus of those in attendence of the previous public meetings, was presented to the
Bicycle Commission. After considering numerous factors,
including feedback from community meetings and the consultant retained on the project, the proximity to desirable destinations, relative costs,
projected usage by the community, convenience and accessibility, the Bicycle Commission unanimously recommends to the City Council that
the bike/pedestrian underpass be located at Middle/Burgess.
|
|
2008, Aug
|
City staff meets with representatives of the potentially impacted property owners Stanford University and Menlo-Station Development.
|
|
2008, Jul 31
|
A citywide meeting will be held to discuss ideas, concerns, and possible locations for an undercrossing.
|
|
2008, Jun 26
|
A neighborhood meeting is held to discuss ideas, concerns, and possible locations for an undercrossing.
Presentation
|
|
2008, May 20
|
The City Council authorizes the City Manager to enter into an agreement
in the amount of $40,968 with Alta Planning and Design to develop a
Caltrain bicycle/pedestrian undercrossing location and plan line.
Staff Report |
Summary of Actions |
Meeting Minutes
|
The preferred undercrossing location identified in two public meetings and supported by both the Bicycle and Transportation Commissions is shown in red below.
|
|