    Burgess Gymnasium Expansion Project

    Conceptual rendering of the proposed new gymnasium at Alma Street.

    Planned Activities
    2008, Jul 15 The City Council will be presented with a recommendation to authorize an agreement with LSA, one of the City's on-call environmental consulting firms, to perform an environmental study and to develop a focused Environmental Impact Report.
    Staff Report
    Past Activities
    2008, Jun 23 John Arrillaga is identified as the donor, and preliminary building plans, elevations, and renderings of the proposed new gym are made available.    News Release

  • Floor Plan  |  Site Plan  |  Elevations

  • View from Alma Street adjacent to the Library Parking Lot looking northeast

  • View from Alma Street adjacent to the Skatepark looking northwest
         (streetscape elements are not shown)

  • View from the creekside path looking at the proposed northwest elevation
         (landscape elements and the abutting Recreation Center are not shown)
  • 2008, May 21 The Parks and Recreation Commission moves to recommend that the City Council direct staff to pursue the donor option as the preferred alternative for new gymnasium development at Burgess Park.
    Staff Report  |  Meeting Minutes
    2008, May 20 The City Council authorizes an agreement with DKS Associates to conduct a traffic impact analysis of the various conceptual plans.
    Staff Report  |  Meeting Minutes
    2008, Apr 29 The City Council is presented with a report on the project's status, which includes an offer by a member of the community to build a new gymnasium in the location proposed by Scheme 1 (between the existing Recreation Center and Alma Street).
    Staff Report  |  Meeting Minutes  |  Gym Plan Proposed by a Potential Donor
    2008, Apr 16 Refined conceptual designs and cost estimates are presented to the community and the Parks and Recreation Commission at the Commission's regular monthly meeting.

  • Refined Scheme 1:  $20.0 M

  • Refined Scheme 2:  $23.8 M

  • Refined Scheme 3:  $25.7 M

  • Table of Cost Estimates
  • 2008, Mar 12 Several preliminary schemes are presented to the community and the Parks and Recreation Commission at the Commission's monthly meeting.

  • Scheme 1: Renovate and expand the existing building for gymnastics and
                           construct a new gymnasium adjacent to the Recreation Center.

  • Scheme 2: Construct a new gymnasium/gymnastics building at the existing site.

  • Scheme 3: Construct a new gymnasium at the existing site and construct a new
                            gymnastics building adjacent to the Recreation Center.

  • Scheme 4: Construct a new gymnasium/gymnastics/recreation center at the site
                            of the existing Recreation Center.
  • 2008, Feb 25 A community meeting is held to review the findings of the facility assessment and focus groups and to discuss any gym/gymnastics issues not previously identified.
    2008, January Field Paoli and its subconsultants assess the existing conditions of the Burgess Gym and Gymnastics Center. Additionally, The Sports Management Group conducts four focus group meetings to identify the needs, desires, and concerns of the gym and gymnastics facility users, staff, and neighboring residents.
    Assessment Summary
    2007, Dec 11 The City Council awards a contract for performing a programming study and developing a conceptual design to Field Paoli Architects of San Francisco.
    Staff Report  |  Meeting Minutes
    2007, Apr 03 The City Council votes to proceed with the Burgess Gymnasium Expansion Project as the next major project to be undertaken using Measure T funds.
    Staff Report  |  Meeting Minutes